Sherbeck Field Scoping Meeting Set for May 1
Fullerton College is preparing a Draft Environmental Impact Report for the Fullerton College Sherbeck Field Improvements Project. The proposed project encompasses the installation of permanent prefabricated aluminum bleachers, six field lighting stanchions, a new sound system, press box and storage building at the existing Sherbeck Field. Sherbeck Field would continue to be used for academic instruction, competitive athletics, and rentals; however, Sherbeck Field is proposed to host competitive football games, which are currently held at other locations. The inclusion of field lighting as part of the project would allow Fullerton College to add more evening classes, to offer a balanced schedule, and provide more class options for students who may not be able to take physical education during the day. It is anticipated that these improvements would begin in spring 2019 and would last approximately six months.
Public Scoping Meeting
A public scoping meeting will be held on Tuesday, May 1, 2018, beginning with a Project Presentation at 6 p.m. in the Fullerton College Campus Theatre (Building 1300) located at 321 E. Chapman Avenue, Fullerton, CA 92832, followed by an Informational Open House in the Fullerton College Center (Building 200), Rooms 224, 226, and 228
Documents
Notice of Preparation of a Draft Environmental Impact Report for the Fullerton College Sherbeck Field Improvements Project – Download PDF
Initial Study for the Sherbeck Field Improvements Project – Download PDF
Visit www.fullcoll.edu/campusprojects to learn more.